Shared hosting → VPS migration: switching over without downtime
Tickets
Shared hosting → VPS migration: switching over without downtime
When a shared hosting site maxes out, the move to a VPS needs preparation. DNS, files, database, testing, and rollback: the step-by-step sequence, demonstrated live.
📅 Wednesday, March 17, 2027 · 17:00 (Morocco) / 12:00 (Montreal) · 30 minutes
Monthly webinar — third Wednesday of the month. Online on Zoom, waiting room enabled, Q&A at the end of the session.
A site that slows down, a need for specific modules or PHP versions, a client that is growing: shared hosting reaches its limits. But migrating is daunting, often because of a single question — how long will the site be unavailable? The answer comes down to a precise sequence, prepared before the switchover.
What you will learn:
- The signals that it is time to leave shared hosting, and what an NVMe VPS changes (vCPU, RAM, NVMe storage, dedicated IPv4).
- The migration demonstrated step by step, live: copying files, exporting and importing the database, LiteSpeed cache, testing on a temporary domain.
- The DNS switchover plan and the rollback: how to revert within minutes if a check fails.
Who it's for: freelancers and agencies that host their own site or their clients' sites, and cannot afford downtime. Discover Open Vista NVMe VPS.
Meeting ID: 84741785396 — Passcode: gP1PAV
Direct link: https://us05web.zoom.us/j/84741785396?pwd=hzTHBylOtcgKXbP0bwiVEvzJw6bvFe.1
Learn more: https://openvista.ma/vps